RiihimĂ€ki Water’s waste water treatment plant project, 2014
MORE CAPACITY FOR THE WASTE WATER TREATMENT PLANT
RiihimĂ€ki Water (RiihimĂ€en Vesi) is a long-term partner for Mipro. The latest example of the co-operation between the two companies is the extension and renovation project of the waste water treatment plant. Miproâs role in the project was to deliver the automation. The project was completed at the end of 2014.
SUCCESSFUL PROJECT FROM BEGINNING TO END
The implementation of automation for the renewed and extended RiihimĂ€ki plant was a large-scale project. In its most critical stage the plantâs old automation system was replaced with the new one. All the parts of the automation technology were not renewed and they needed to be integrated into the new system. This provided an additional challenge.
The planned lifecycle of the automation system renewed in the project is 15-20 years. A customer support contract between Mipro and RiihimÀki Water helps to achieve this long lifespan.

RIIHIMĂKI WATER, INSTRUMENTATION AND AUTOMATION PROJECT OF THE WASTE WATER TREATMENT PLANT:
- Process automation
- MiSO Net control room system modernisation
- 10 automation centres, a total of approx. 3000 I/O points
- Integration of the plantâs temperature, ventilation, instrumentation and automation to the process automation
- Approx. 280 new instrumentation devices